When Should You Build an ADU in San Diego?

share Share

38 min read

An ADU (Accessory Dwelling Unit) is a self-contained residential unit located on the same lot as a single-family home. In San Diego, ADUs are booming thanks to relaxed zoning laws, rising home prices, and increasing demand for multigenerational living and rental income. The state has actively encouraged development to address the housing crisis, making the process faster and more accessible than ever. From 2016 to 2022, ADU permits in California increased by 15,334%, reaching over 83,000 units statewide. San Diego continues to lead the trend with growing local incentives and streamlined approvals.

Aerial view of ADU site preparation in San Diego backyard – When Should You Build an ADU in San Diego

What Is the Best Time of Year to Build an ADU in San Diego?

The best time to build an Accessory Dwelling Unit (ADU) or granny flat in San Diego is between May and October, when the region experiences consistently dry, mild weather ideal for site preparation, foundation work, and the overall construction phase. During these months, rainfall averages less than 1 inch, minimizing weather-related delays and ensuring your contractor can complete work like utility connections and inspections on schedule (US Climate Data).

For homeowners aiming to reduce overall construction costs, the off-season between November and February can be advantageous. Many builders and subcontractors offer 5–10% lower rates due to decreased demand, which can offset certain permit fees or utility setup expenses.

Ultimately, the right time to start depends on your goals—whether you want faster completion and smoother weather conditions, or lower pricing and easier contractor availability. Planning your ADU design and permitting at least one season in advance ensures that all zoning regulations, fire safety requirements, and inspections align seamlessly before breaking ground on your backyard cottage or rental unit.

Modern San Diego home exterior under clear skies – What Is the Best Time of Year to Build an ADU in San Diego

Schedule ADU construction during dry months (May–October) for faster timelines and fewer weather interruptions.

When Should I Start the ADU Permitting Process?

You should begin the ADU permitting process at least 3–5 months before your planned construction start date. In San Diego, permit approvals typically take 12 to 20 weeks, depending on project complexity, local zoning regulations, and whether your design follows standard ADU plans or custom specifications. This applies to both site-built ADUs and prefab ADUs installed on a permanent foundation.

While the City of San Diego has made progress streamlining approvals, the process can still feel complex. As Denise Pinkston of the Casita Coalition noted, “Many homeowners say the process can feel overwhelming — like ‘going to court without a lawyer.’”

Fortunately, recent state reforms have simplified the permitting process, cutting review timelines from 8–10 months to about 3–5 months. The city’s Public Works Building & Safety division has also improved digital plan review systems, helping move projects faster through zoning and building requirements.

To stay on schedule, homeowners should work with an experienced design-build team early on, verify that their property meets land-use rules and HOA covenants, and prepare necessary documentation like site surveys, structural plans, and fire safety layouts. Planning ahead ensures smooth progress from initial submittal to final inspection, allowing you to move confidently into construction without unnecessary delays.

Architectural plans for ADU design in San Diego – When Should I Start the ADU Permitting Process

Begin ADU permitting at least 3–5 months before construction to streamline approvals and prevent project delays.

How Long Does It Take to Design and Build an ADU?

The full timeline to design and build an Accessory Dwelling Unit (ADU) in San Diego generally ranges from 10 to 16 months, depending on project size, permitting speed, and contractor availability. Each phase of the project—from design to construction—must also comply with local building requirements and zoning regulations, which can vary by neighborhood or if the property lies within a Historic Overlay District.

Here’s a typical timeline breakdown for San Diego ADUs, including both site-built and prefabricated home options:

  • Design & Engineering: 1–3 months — Includes drafting plans, structural design, and obtaining site surveys.
  • Permitting: 3–5 months — Covers submittals, corrections, and approval through the City’s Public Works and Building & Safety departments.
  • Construction: 5–8 months — Spanning foundation work, framing, and utility connections, followed by inspections and final approvals.

These timeframes align with San Diego’s recent improvements to its Standard ADU Plans Program, which helps streamline approval for smaller backyard cottages and tiny homes. As demand for multigenerational living and rental units continues to grow, the city has enhanced efficiency—issuing 1,907 ADU permits in 2023 alone (KPBS).

To stay on track, homeowners should start planning early with a design-build firm experienced in San Diego’s Unified Development Code, zoning rules, and ADU-specific permitting process. This preparation ensures a smooth path from design approval to final inspection, avoiding unnecessary delays or compliance issues.

Framed ADU construction in San Diego backyard – How Long Does It Take to Design and Build an ADU

Plan early and expect 10–16 months from design to completion. Partnering with a design-build expert keeps timelines efficient and compliant.

When Does Building an ADU Make Financial Sense?

Building an Accessory Dwelling Unit (ADU) makes the most financial sense when the long-term benefits—like rental income, property appreciation, and flexible use—outweigh the upfront construction costs and permit expenses. For many San Diego homeowners, this break-even point comes sooner than expected, especially in high-demand neighborhoods ideal for multigenerational living spaces or income-producing rentals.

On average, the return on investment (ROI) for ADUs in California is around 70%, with a typical payback period of 4.4 years through steady rental income. ADUs not only create passive revenue but also enhance the appraised value of your property, boosting it by as much as 25–30%. As housing expert Stan Acton points out, “With borrowing costs down, now is the ideal time to invest in building an ADU.”

Programs like the ADU Financial Assistance Program can also help offset initial costs, while new tax exemptions and fee reductions make the process more affordable than ever. With inflation cooling and financing conditions improving, building an ADU in 2025 is a strategic move for homeowners seeking long-term equity growth, blended ROI, and future housing flexibility—whether as a second unit, rental property, or private space for family members.

Finished ADU with landscaped entryway in San Diego – When Does Building an ADU Make Financial Sense

An ADU can boost your property value by 25–30%—start planning when ROI aligns with your long-term investment goals.

Is Now a Good Time to Build an ADU in San Diego?

Yes — now is one of the best times to build an ADU in San Diego thanks to favorable laws, strong housing demand, and improved city processes. California’s housing policies and local land use regulations have evolved to make building an Accessory Dwelling Unit (ADU) or manufactured home simpler than ever, while financing opportunities have become more accessible as interest rates stabilize. The City of San Diego continues to streamline permit approvals through its ADU Guidebook and pre-approved design programs, cutting review times and easing the path for homeowners.

The momentum behind ADUs is clear. In 2023, one in five new homes built in California was an ADU, showing just how impactful these small-scale housing solutions have become in addressing the state’s housing needs. With a growing focus on Neighborhood Diversity and multigenerational living, now is the perfect moment for homeowners to take advantage of this supportive environment.

With strong ROI potential, favorable construction costs, and improved permit efficiency, San Diego homeowners can confidently move forward with their ADU projects—knowing that city policies, financing tools, and the housing market are all aligned to make this the ideal time to build.

Modern ADU living room and dining nook in San Diego – Is Now a Good Time to Build an ADU in San Diego

With ADU laws simplified and interest rates stabilizing, now is the perfect time to invest in property value and lifestyle flexibility.

What Should I Know About San Diego ADU Laws Before I Start?

Before starting your Accessory Dwelling Unit (ADU) project in San Diego, it’s essential to understand the city’s land use and development regulations, which determine everything from placement to design. San Diego has some of the most progressive ADU policies in California, allowing homeowners to add rental units or multigenerational living spaces more easily than ever—but compliance with specific building requirements remains key.

Here are the most important local rules to know before you begin construction:

  • Maximum Size: Detached ADUs can be up to 1,200 square feet, depending on lot size and zoning.
  • Minimum Lot Size: There is no minimum lot size requirement for building an ADU.
  • Owner-Occupancy: The city does not require owner occupancy for new ADUs until at least 2025.
  • Setbacks: Maintain a 4-foot setback from the side and rear property lines.
  • Number of Units: You may build one ADU and one Junior ADU (JADU) per residential property.

These local standards are part of San Diego’s broader housing production toolbox, designed to expand affordable housing while respecting neighborhood character and existing land-use codes. Homeowners in areas with Historic Overlay Districts or HOA oversight should verify additional requirements, such as Certificates of Appropriateness or fire-resistant separation standards.

To review the city’s full ADU policies, including zoning maps, setbacks, and submittal checklists, refer to the City of San Diego’s ADU Guide. Understanding these rules early in the process will help ensure your project passes inspections smoothly and avoids costly revisions later.

Aerial view of completed detached ADU in San Diego neighborhood – What Should I Know About San Diego ADU Laws Before I Start

Understand San Diego’s ADU zoning rules early to ensure smooth permitting and compliance from day one.

What Are the Biggest Timing Mistakes to Avoid When Planning an ADU?

Avoiding common timing mistakes can save San Diego homeowners months of delays, unexpected costs, and frustration during the ADU construction process. Since building an Accessory Dwelling Unit (ADU) involves multiple moving parts—permits, contractors, financing, and compliance with local regulations—a proactive timeline is essential to keep your project on track.

Here are some of the most frequent mistakes homeowners make when planning their ADU:

  • Delaying the permit process, which can push your project back by several months and increase holding costs.
  • Ignoring San Diego’s rainy season (November–March), which often slows site preparation and inspections.
  • Skipping a professional site survey, leading to zoning or design complications that trigger costly revisions.
  • Underestimating financing approval time, especially for construction loans, HELOCs, or ADU grant programs.

Experts suggest planning ahead to avoid these pitfalls:

“Homeowners should start planning at least one full season in advance if they want to begin construction in dry months.”

By aligning your permitting timeline with weather patterns and preparing financing early, you’ll minimize risk and ensure smoother progress through the construction phase and final inspection. Homeowners should also stay aware of neighborhood-specific land-use rules, HOA covenants, and public notice requirements that can extend approval times. For detailed climate data and seasonal trends, refer to US Climate Data – San Diego.

Excavation site for ADU preparation in San Diego – What Are the Biggest Timing Mistakes to Avoid When Planning an ADU

Avoid delays by aligning your permit approvals with the dry season and securing financing well before construction begins.

What Is the ADU ROI Timeline?

Most San Diego homeowners recover their Accessory Dwelling Unit (ADU) investment within 4 to 6 years, especially when the unit is rented long-term or used to support multigenerational living while offsetting overall household expenses. Strong rental demand, flexible land-use rules, and consistent home appreciation in the region make ADUs one of the most reliable small-scale real estate investments available today.

Here’s how the numbers usually break down:

  • The average ROI for ADUs in California is about 70%
  • ADUs can increase a property’s appraised value by 25–30%
  • In San Diego, monthly rental rates often exceed $2,000 or more, depending on the ADU’s location, design, and finishes

For instance, if an ADU costs around $180,000 to build and generates $2,200 in monthly rent, the homeowner could recover their investment in less than six years—while continuing to gain equity through increased property value.

With streamlined permitting, reduced System Development Charges, and flexible financing options, ADUs have become one of the most efficient ways to build long-term wealth in compliance with San Diego’s Land Use and Development Code. As housing needs evolve, ADUs remain a high-ROI addition for homeowners looking to balance lifestyle flexibility with sustainable financial growth.

ADU construction progress in residential San Diego lot – What Is the ADU ROI Timeline

Strategic ADU planning helps homeowners recover their investment within 4–6 years through rental income and equity growth.

Should I Finance My ADU Now or Wait?

With interest rates stabilizing and construction demand leveling out across California, 2025 is shaping up to be an ideal time for San Diego homeowners to finance their Accessory Dwelling Unit (ADU) projects. Acting now can help you take advantage of more competitive loan terms and contractor availability—conditions that may tighten once demand picks up again.

There are several financing options available for funding ADU construction:

  • Cash-Out Refinance: Replaces your current mortgage with a larger one, allowing you to access built-up equity to fund your project.
  • Home Equity Line of Credit (HELOC): Provides a flexible line of credit based on your home’s equity, ideal for phased construction stages or incremental payments.
  • ADU-Specific Loan Programs: Offered by select credit unions and lenders, these programs are designed to support owner/builder exemptions and ADUs built under local Land Use and Development Codes.

In addition, local and state programs continue to expand financing support. The CalHFA ADU Grant Program provides up to $40,000 for eligible homeowners to cover pre-development costs such as design, permits, or utility connections (CalHFA ADU Grant Program).

By locking in financing now—before demand and material costs rise—homeowners can position themselves strategically for a smoother and more affordable build. Be sure to compare lenders, interest rates, and repayment terms to choose the best path for your long-term financial goals.

Aerial view of San Diego property ready for ADU construction – Should I Finance My ADU Now or Wait

Lock in financing before demand rises. Lower competition means better loan terms and faster build timelines for your ADU project.

Who Are the Best ADU Experts in San Diego?

Here are trusted resources for San Diego homeowners considering an ADU project:

  • Better Place Design & Build — A San Diego–based design-build firm specializing in ADUs. They manage everything from site feasibility, ergonomics, permit filings, through final construction. (Better Place Design & Build)
  • Casita Coalition — A California advocacy organization that helped shape ADU legislation, provides homeowner guides and resources on financing and policy. (Casita Coalition)
  • City of San Diego Development Services — The local government department responsible for ADU permitting, zoning compliance, and building inspections—your ultimate regulatory partner. (sandiego.gov)

By engaging one or more of these entities, homeowners gain access to expert guidance, up-to-date policy insights, and proven processes tailored to the San Diego ADU market.

Conclusion

Building an ADU in San Diego is ultimately a matter of timing, and 2025 offers one of the best opportunities yet. With permitting now faster than ever, dry seasons from May through October providing optimal build conditions, and interest rates beginning to stabilize, homeowners can avoid costly delays and maximize returns. On average, ADUs deliver a 70% ROI and pay for themselves within four to six years, while also boosting property value by 25–30%. State and local policies remain highly favorable, signaling strong support for homeowners ready to add space, create rental income, or accommodate family needs. The bottom line: by starting the planning process at least one season in advance, San Diego homeowners can ensure their ADU project is timed perfectly to capture both financial and lifestyle benefits.

Backyard ADU under construction in San Diego – Conclusion

Start your ADU journey at least one season ahead. Timing your build strategically ensures optimal ROI and smooth project execution.

Frequently Asked Questions

It depends on your property, goals, and existing home layout. Adding onto your home can seem cheaper upfront but often involves significant structural changes, permits, and disruptions to your main living space. Building an ADU, on the other hand, typically has higher initial costs but can add long-term value and potential rental income. For many homeowners in California, ADUs are considered the better long-term investment because they function as independent units that generate income and increase property value by 25–30%.

The California Housing Finance Agency (CalHFA) offers a grant of up to $40,000 to help homeowners cover pre-development and soft costs for building an ADU. These funds can go toward design, permits, surveys, impact fees, and energy reports. The program is designed to make ADU construction more accessible to low- and moderate-income homeowners. Grants are awarded on a first-come, first-served basis, so early application is encouraged.

Massachusetts recently passed a statewide law allowing homeowners to build one ADU by right in most single-family zoning districts. The new law limits restrictive permitting, eliminates owner-occupancy requirements, and caps unit size (typically up to 900 square feet). This change removes many local barriers and makes it significantly easier for homeowners to add ADUs across the state—similar to the reforms seen earlier in California.

In San Diego and most of Southern California, the best time to build an ADU is between May and October, when the weather is dry and predictable. Starting construction during this window minimizes delays caused by rain and ensures smoother progress for site work and framing. However, homeowners who plan ahead and start their permitting during the winter months (November through February) can be ready to break ground as soon as the dry season begins.

You should consider building an ADU if you want to generate rental income, create a private space for family members, or increase your property’s value and flexibility. ADUs are also ideal for aging-in-place planning, providing independent living options close to home. In high-demand housing markets like San Diego, they offer both lifestyle convenience and a strong financial return—often paying for themselves within 4–6 years through rental income and appreciation.